Our process

Our process is based upon the Royal Institute of British Architects (RIBA) work stages 0-7. This helps both client and architect track the process, with a high level of transparency and communication.

This page explores our full process, from briefing, design, planning to construction management and completion of your development.

Our services are flexible and tailored to suit each client’s and project requirements on an individual basis. Please contact us to discuss your projects further.

A black hand pointing towards a vertical sign that reads 'Ribba Stage 1' in white text, with orange bars on the sides and a gray arrowhead on the right side.
A table or page with a briefing section about a project, listing tasks such as briefing, surveys, costing, and research, with instructions on beginning the journey with the client by understanding their needs, examining property history, and setting constraints.
Icon of a document with lines representing text, enclosed in a circle with a black background
No pencil and ruler icon surrounded by a circle, indicating a 'no' or prohibition symbol.
A section of a presentation slide about design, featuring a header labeled '2', a subheader 'DESIGN', a paragraph explaining the creative process, and a task list including design concepts, mood boards, options, and costing.
Sketch of a multi-story building with several windows and a staircase with people walking on stairs and street level
Page from a presentation slide titled "Planning." The slide discusses exploring how to approach the planning department and preparing a detailed planning application. It lists tasks such as planning application, consultant advice, surveys, and planning management.
A house with a brick lower level and upper floors with traditional brick and siding, surrounded by trees with fall-colored leaves, a lawn, and a patio with two red chairs.
Icon of a strategy or organizational chart on a presentation board with a tripod stand, enclosed in a circular border.
Architectural drawings and a model of a roof junction with detailed sections and construction elements, including concrete, insulation, timber, and finishes.
Icon of a file with a chef's hat on it within a circle.
Section titled 'Technical/Contractual' discussing preparing technical information for construction, including tasks like detailed design, tender, contract, and statutory requirements.
Black and white icon of a brick wall with four rows of bricks inside a circle with an outline.
The photo shows the underside of a wooden roof or ceiling structure under construction, with exposed beams and framing. There is an open space or skylight in the middle, surrounded by the framework. The background reveals a construction site with building materials, tools, and trees.
A guide or presentation slide outlining the construction phase, emphasizing managing contracts, monitoring progress, costs, and quality, with tasks listed including contract administration, valuations, payment certificates, and quality control.
Wooden door with a keyhole, partially covered by a shadow of a window or blinds, with some greenery visible on the right side.
Icon of two people connected by lines, representing teamwork or collaboration.
A section of a construction or project management guide discussing the handover process after building completion, including tasks like certification, snagging, final account, and retention.